China Maritime (Jiaxing Pinghu wharf) automatic monitoring system project
Published on:
2014-06-01
Views:
Our company has completed the China Maritime (Jiaxing Pinghu wharf) automatic monitoring system project and put it into use.
Our company cooperated with the Shanghai Meteorological unit to complete an automatic monitoring system on the China Maritime (Jiaxing Pinghu) platform, which mainly monitors parameters such as flow velocity, flow direction, water temperature and meteorology. The site is powered by solar energy, and the 24-hour uninterrupted measurement mode is adopted. The measurement data are sent to the designated collector for processing; The on-site measurement data is in good agreement with the curve, and the equipment has been put into use.



Relevant solutions
In the face of more than 90% of the domestic hydrological cableways, the current situation is generally low flow rate and there are many water plants.
In the national water resources monitoring capacity-building project, the flow velocity and flow at the sewage outlet of the river are measured, and the ultrasonic Doppler flow meter equipment is selected as the monitoring equipment.
In the application of tidal power generation and hydropower station, ultrasonic Doppler flow meter is an ideal measuring equipment.
2016 Nanjing major project - Nanjing black and smelly river training provides online flowmeter
2016 is the first year of the "13th five year plan" and the first year of the official implementation of the State Council's "ten water items". As one of the major projects of Nanjing municipal government in 2016, the black and smelly river training project in Nanjing reached and exceeded expectations at the end of 2016.