The 13th five year plan -- online flow monitoring of Binchuan Irrigation District in Yunnan
Published on:
2017-07-16
Views:
22
In 2017, No. 1 central document focused on agricultural water saving as a directional and strategic event, and required to accelerate the improvement of the national policy system for supporting agricultural water saving; Accelerate the construction of major water conservancy projects, pay close attention to the repair of agricultural facilities and water conservancy projects damaged by floods, and strengthen the construction of weak links in water conservancy and the "five small water conservancy" projects;
We will accelerate the implementation of the project to consolidate and improve drinking water safety in rural areas, and carry out the investigation and treatment of potential safety problems in dry wells, ponds, and drinking water in rural areas; To fully implement the river head system, in order to actively respond to the high positioning and high requirements of the central government, provinces, cities and counties for water conservancy construction, and constantly study and deploy, the "1.53" development idea was formulated, and the "1.35" water conservancy construction backbone year was well implemented.


Relevant solutions
In the face of more than 90% of the domestic hydrological cableways, the current situation is generally low flow rate and there are many water plants.
In the national water resources monitoring capacity-building project, the flow velocity and flow at the sewage outlet of the river are measured, and the ultrasonic Doppler flow meter equipment is selected as the monitoring equipment.
In the application of tidal power generation and hydropower station, ultrasonic Doppler flow meter is an ideal measuring equipment.
2016 Nanjing major project - Nanjing black and smelly river training provides online flowmeter
2016 is the first year of the "13th five year plan" and the first year of the official implementation of the State Council's "ten water items". As one of the major projects of Nanjing municipal government in 2016, the black and smelly river training project in Nanjing reached and exceeded expectations at the end of 2016.
Contact Us
6F, Jinfeng Building, information photoelectric Park, torch high tech Zone, Huli District, Xiamen, Fujian, China
Follow Us
Mobile phone scan
Follow BOYIDA official account